Order Status
This page contains the status of all new orders for Windupkeys as of 11/27/11.

NOTE:
Be sure to "refresh" this page in case your Web Browser is looking at an
older version that is saved on your computer.

Individuals can check their status by looking in the list above for their "unit number" which should have been included in one of their reply emails.

Another change in status page. I'm now reporting the details of the orders so you can see one of my problems in dealing with a total of at least 40 different combinations of key shape, color, base and motor type. Hard to predict ahead! Actually I have some combinations ready to assemble but they are the wrong color, shape or motor. Actual planned ship dates based on having all the required parts ready to assemble and they are staged for completion.

Table boxes that are green in color are all ready for assembly. Status Codes are as follows:

  • C = In Cutting Process
  • D = Done
  • Dev = In development/design
  • P = In Powder Coating Process
  • OH = On Hand
  • OO = On Order
  • Ready = Ready to ship, balance due
  • W = In Welding Process
Unit
Number
Vehicle Key Shape Key Color Motor Type Key Status Base Status Drive Parts Status Motor Status Estimated Parts Available Date Planned Ship
Date
11012 VWNB 8-Round Silver 0 D D OH OH 10/21 Ready
11017 Metro Lilliput Silver 2 W C OH OH 12/12 12/16
11030 Cube Oval Black 1 W W OH OH 12/12 12/16
11031 smart Oval Silver 1 D D OH OH 10/14 Ready
11034 smart Oval Black 1 D D OH OH 10/14 Ready
11036 VWNB 8-Round Black 2 W W OH OH 12/12 12/16
11039 Hotshot 8-Round Silver 2 W C OH OH 12/12 12/16
11041 smart Oval Black 1 W P OH OH 12/12 12/16
11042 smart Oval Black 1 W W OH OH 12/12 12/16
11043 Fiat 8-Round TBD 1 W W OH OH 12/12 12/16
11045 smart Oval TBD 1 W W OH OH 12/12 12/16
11046 smart 6-Round Silver 1 D D OH OH 10/21 Ready
11050 smart Oval Black 1 W W OH OH 12/12 12/16
11051 smart Oval Black 1 W W OH OH 12/12 12/16
11052 smart Oval Black 1 W W OH OH 12/12 12/16
11053 smart Oval Black 1 W W OH OH 12/12 12/16
11054 smart Oval Black 1 W W OH OH 12/12 12/16
11055 smart Oval Black 1 W W OH OH 12/12 12/16
11056 smart Oval Black 1 W W OH OH 12/12 12/16
11057 smart Oval Black 1 W W OH OH 12/12 12/16
11058 smart Oval Black 1 W W OH OH 12/12 12/16
11059 smart Oval Black 1 W W OH OH 12/12 12/16
11060 smart Oval Black 1 W W OH OH 12/12 12/16
11061 smart Oval Silver 1 W W OH OH 12/12 12/16
11062 smart Oval Silver 1 W W OH OH 12/12 12/16
11063 smart Oval Silver 1 W W OH OH 12/12 12/16
11064 smart Oval Silver 1 W W OH OH 12/12 12/16
11065 smart Oval Silver 1 W W OH OH 12/12 12/16
11066 smart Oval Silver 1 W W OH OH 12/12 12/16
11067 smart Oval Silver 1 W W OH OH 12/12 12/16
11068 smart Oval Silver 1 W W OH OH 12/12 12/16
11069 smart Oval Silver 1 W W OH OH 12/12 12/16
11070 smart Oval Silver 1 W W OH OH 12/12 12/16
11071 Mini Oval Silver 1 W P OH OH 12/12 12/16

Individuals can check their status by looking in the list above for their "unit number" which should have been included in one of their reply emails.

The building process involves a key and a base. Each part must be cut, then welded, then powder coated, and then finally assembled. These are the four main steps for both the key and the base.

The expected date for all parts to be ready for assembly is based on current supplier schedules and does not include the unexpected interruptions from my part-time job, relatives visiting, trips out-of-town, sickness, etc.

Because scheduling can be unpredictable at times, I ask that customers do not send their final payment balance until I send an email with a final payment request. Paying in full does not hurry along my suppliers.....

[Home] [History] [Construction] [Models] [FAQ]
[Gallery] [Ordering] [Sale Items!] [Custom Keys] [ Contact Us!]

Revised: 11/27/11